Brickwork and Returf
This project was a pleasure to get stuck into during the warmer months of the year.
Our customer requested the old retaining walls to be demolishes and replaced with this stunning new brickwork.
We also built large steps leading up to the garden matching the same porcelain tiles which were used on the main patio previously.
We then moved onto the garden itself removing over 50 tons of soil and replacing areas with fresh topsoil to take away and large slopes.
This was the main request from the customer as previously the garden was on a huge slope with ground heights differing over a meter from one end of the garden to the other.
Once the garden had be levelled to satisfaction we started to roll out the turf in opposite directions to give it the freshly cut look on completion. We also ensure all joints are pinched tight to avoid separation as the roots take to the soil below.
In total this projects during took 6 days from start to finish.